April 6, 2026 work session · Sewer rates, a sidewalk and a park in progress
The sewer rate ordinance passed after its hearing, the 2026 budget was introduced and a resident's damaged sidewalk got a fast response.
By Kevin French · · 2 min read
The April 6 work session opened just after 7 p.m. with all five committee members present. A long agenda, a sewer hearing and one resident's sidewalk made for a full night.
Sewer ordinance adopted
Ord. 11-2026 came up for its public hearing. The mayor explained it raises sewer rates by about 5 percent to keep up with rising operating costs, and noted the sewer utility barely stayed in the black the year before. No one from the public spoke. The committee adopted it unanimously.
The plan laid out at the March 16 meeting is to line and seal aging pipes that let groundwater and storm runoff into the system, a long-term fix that costs less over time.
Brookside Reserve
In March I moved to table Res. 73-2026 after the solicitor received a request to give the Brookside Reserve work more time. On April 6 the resolution came back. It denies release of the performance guarantee for the site improvements.
I seconded it and it passed unanimously. Until the work is done right, the guarantee stays put.
Budget and other business
The 2026 municipal budget was introduced (Res. 79-2026).
The committee introduced two ordinances for hearing on April 20. Ord. 13-2026 would vacate a portion of East Avenue. Ord. 14-2026 adopts a redevelopment plan for property on Mullica Hill Road.
Three more 100 percent totally disabled veterans received property tax refunds. I moved the first of them, Res. 81-2026. The committee cancelled interest on one property's taxes that resulted from an assessor's error (Res. 80-2026).
Res. 85-2026 asks the state for a second extension on the grant for the crosswalk at the Ella Harris Park entrance across from ShopRite. The administrator said long state review times for the engineering design made the extension necessary. Res. 86-2026 submits the strategic plan for the Mantua and Harrison Municipal Alliance grant, a joint $10,000 substance abuse prevention program with a $1,250 township match.
The committee voted to move the Dr. Irene Hill Smith memorial park project forward into its next phase of planning, which includes a mural and a dedication with a plaque and podium.
I made the motion to pay the bills.
A sidewalk and a fallen tree
I made the motion to open the floor for public comment on all matters. One resident came with a specific problem. On December 14, 2025, crews clearing a fallen tree from the road moved the tree and its root ball onto the sidewalk in front of her home, and the slabs were displaced.
Her insurance denied the claim. She asked the township to inspect the site and take responsibility for the repair.
The committee agreed to give the administration until the next day to review the options and the liability. And the hazard would be fenced off in the meantime so nobody trips on it.
That's how it should work. A resident brings a real problem, the hazard gets secured and the township takes a hard look right away.
Other residents spoke about planning for school growth as housing grows and about a proposal for the township to pursue a Film Ready New Jersey certification.